Heavy duty hook load limits

The customer
- Size: Small enterprise
- Sector: Heavy machinery
- Country: United Kingdom
The Project
- Size: 25-30 man-hours
- Duration: 2-3 weeks
The Problem
- Revision of the load nominal limits
- Investigation of maximum stresses and redesign proposition
Proposed solution
- Current working conditions and limit conditions simulation
- Redesign prosition and assessment through simulation
The simulations
- Maximum stress analysis at load limit conditions (FEA analysis)
- Optimization of the design through geometry changes (FEA analysis)
Project overall results
- Maximum nominal load increased by 12% with 16% less material
- Savings over £11,500 for the customer in prototyping and testing (estimate)
- Savings of more than 6 weeks in development time (estimate)